septicfresno.com (559) 314-2015

The expensive end: drain fields, seepage pits, and what the county will allow

Tank problems cost hundreds. Dispersal problems cost five figures. Knowing which one you have is the whole game.

(559) 314-2015 Call for a free quote

septicfresno.com is not a contractor. It is a free service that connects you with independent licensed contractors in Fresno. All work is performed by the contractor you hire.

What actually fails

Drain fields rarely fail because a pipe broke. They fail because of the biomat, a dense biological layer that forms where effluent meets soil. A thin biomat is useful and does real treatment work. A thick one is a seal.

Three things thicken it past the point of no return:

Fresno soil is the reason the numbers here are different

Table 204 of the Fresno County program sets how many gallons per day each square foot of soil is allowed to accept. The spread is enormous.

SoilMaximum application rate
Coarse sand, sand, loamy sand0.8 gallons per day per square foot
Sandy loam, structured0.4 to 0.6
Clay loam, structured0.2 to 0.4
Clay or silty clay, moderate to strong structure0.2
Clay, massive or platySpecial design required

Same house, same number of bedrooms, same wastewater. On sand it needs a certain amount of trench. On structured clay it needs four times that much. On massive clay the table does not give you a number at all, it sends you to an engineer.

Then there is the hardpan. Much of the valley floor around Fresno sits on the San Joaquin soil series, whose defining feature is a silica cemented hardpan, a duripan, commonly encountered somewhere in the twenty to forty inch range. Water does not go through it. A trench dug into hardpan is a bathtub.

Which is why Fresno County has seepage pits at all

Section 701.1 of the county program authorizes seepage pits for exactly this situation, in the county's own words: for "areas of the County where subsoils are clay, clay pan, fragipan, hard pan and do not offer opportunities to install typical leach trench disposal type of systems."

A seepage pit goes down instead of out, past the restrictive layer into whatever will accept water below it. The rules attached to it are strict:

Anything outside that has to go to the Regional Water Quality Control Board rather than the county. And the county states directly that these systems address "only disposal requirements as opposed to treatment and disposal," which is why the state has been squeezing them and why your options narrow every time the program is revised.

The trap: your grandfathered system stops being grandfathered

This is the single most expensive thing a Fresno County homeowner can fail to know.

Systems installed before current standards sit in Tier 0 of the state policy. The county program says they "are not covered under this LAMP until such time as these existing systems fail. Once a failed OWTS has been identified, the system will be repaired under the requirements of this LAMP."

So the day your system is declared failed, the replacement has to satisfy the current program. On a lot that predates the rules, some of these are hard to meet:

Setback required fromTankDispersal fieldSeepage pit
Private water well or spring100 ft100 ft150 ft
Property line adjoining private property50 ft50 ft75 ft
Buildings or structures5 ft8 ft8 ft
Streams and flowing water100 ft100 ft150 ft
Trees10 ft-10 ft
Road easement, pavement or driveway5 ft5 ft5 ft

On top of that: a 100 percent expansion area has to exist and be usable, percolation tests have to come back under 200 minutes per inch on average with no single test above 240, and if the parcel is being newly developed or gaining a second dwelling, a nitrogen loading analysis is required, because the program limits density to one system per two acres.

That last point catches people building ADUs. A granny flat on a rural Fresno County parcel is not just a building permit question, it is a wastewater question, and the answer can be no.

What the county needs before anyone can quote a real replacement

Section 1302.1 requires a site evaluation with a minimum of two backhoe test holes per parcel, at least one in the primary dispersal area and one in the replacement area. Soil borings can supplement them but cannot substitute for them. Each hole has to go 5 feet deeper than the proposed bottom of the dispersal system, or 10 feet deeper than design depth if a seepage pit is proposed. County staff inspect the site alongside the qualified professional and log the holes.

Percolation tests come next: a minimum of three test holes when the primary and replacement areas are close together, six when they are not, each 6 inches in diameter with a presoak of at least four hours.

The site evaluation expires one year after submittal. So does the design. If you get a study done and sit on it for eighteen months, you pay for it twice.

The question that separates a real bid from a number pulled out of the air: "Is this price based on a site evaluation with backhoe test holes in the replacement area, or on walking the yard?" A drain field quote written without soil data is a guess, and in Fresno County it is a guess about the one variable with a four to one swing in it. Two bids that are thousands apart usually differ because one of them assumed sand and the other assumed clay. Ask each bidder what application rate from Table 204 they used and how many square feet of dispersal that produces. If they cannot answer, they have not designed anything yet.

What repair actually means, when it is possible

Jetting and chemical rejuvenation get sold as cheap alternatives to replacement. They can clear a line. They do not remove an established biomat from the soil, and buying two more years for $1,500 is only a good deal if you spend those two years planning the real fix.

Abandoning an old tank the way the county requires

If you replace a system or tie into a sewer, the old tank cannot just be left in the ground. Section 1101 requires that the sewage be removed, the cover or arch removed, and the bottom perforated so it can no longer hold liquid. Critically: the destruction has to be inspected before the tank is filled, and filling cannot go above the sidewalls or the outlet pipe until that inspection happens. When abandonment follows a sewer connection, the fill has to be done within 30 days of connecting.

Contractors who backfill first and call for inspection after create a problem that gets solved by digging it all back up.

One more rule that decides the whole project

The county cannot grant a variance for a new or replacement system where public sewer is available, and available means within 200 feet of the building or drainage facility on a lot that abuts a sewer. There is one exception: if the connection fees plus construction cost exceed twice the total cost of the replacement system, and the county finds the discharge will not harm groundwater or surface water. If your parcel is on the edge of Fresno or Clovis and the main reached your street since the house was built, this is the first question to settle, before anyone prices a leach field.

Get a free quote

Tap to call: (559) 314-2015